{"id":3954,"date":"2016-08-08T16:53:42","date_gmt":"2016-08-08T16:53:42","guid":{"rendered":"http:\/\/www.dev.terre-armee.com\/?p=3954"},"modified":"2020-01-10T18:48:54","modified_gmt":"2020-01-10T18:48:54","slug":"rio-de-janeiro-reinforced-earth-walls-for-the-transolimpica-brt-expressway","status":"publish","type":"post","link":"https:\/\/www.terrearmeeindia.com\/rio-de-janeiro-reinforced-earth-walls-for-the-transolimpica-brt-expressway\/","title":{"rendered":"Rio de Janeiro – Reinforced Earth walls for the Transolimpica BRT Expressway"},"content":{"rendered":"
Terra Armada (Brazil), being responsible for the design, supply and technical assistance of more than 46,500 m\u00b2 of Reinforced Earth\u00ae walls with TerraClass\u00ae facings equipped with more than 700 tons of high adherence strips, participated predominantly in the project.<\/strong><\/p>\n This dedicated 26 km expressway passes through two tunnels and on several bridges and flyovers. This \u00a0two three-lane carriageways with one lane in each sense dedicated the BRT system will be a vital artery during the 2016 Olympic Games (from August 5 to 21, 2016). More about:<\/strong>
\nIndeed, they connect the two largest sites of the competition, the Olympic Park in Barra da Tijuca and the Deodoro Sports Complex.<\/p>\n
\nRoads & Motorways<\/a><\/p>\n<\/div>More information<\/h2>\n<\/div>