{"id":8369,"date":"2022-01-13T10:37:59","date_gmt":"2022-01-13T10:37:59","guid":{"rendered":"https:\/\/www.terrearmeeindia.com\/?post_type=avada_portfolio&p=8369"},"modified":"2022-01-20T06:53:47","modified_gmt":"2022-01-20T06:53:47","slug":"shamshabad-interchange","status":"publish","type":"avada_portfolio","link":"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/","title":{"rendered":"Shamshabad Interchange"},"content":{"rendered":"

Construction of Reinforced Earth\u00ae Wall on the Outer Ring Road to Hyderabad city (Phase I \u2013 Gachibowli to Shamshabad) in the state of Andhra Pradesh, India.<\/h3>\n<\/div><\/div><\/div>
<\/div><\/div><\/div><\/div><\/div>

Project Details<\/h3>\n<\/div><\/div><\/div><\/div><\/div>

TYPE<\/p><\/div><\/div>

RE Wall Type TerraTee\u00ae with Freyssisol\u00ae system and HA Galvanized Steel Strips<\/p>\n<\/div><\/div><\/div>

OWNER<\/p><\/div><\/div>

Hyderabad Growth Corridor Limited<\/p>\n<\/div><\/div><\/div>

CONTRACTOR<\/p><\/div><\/div>

Continental Engineering Corporation Pvt. Ltd.<\/p>\n<\/div><\/div><\/div>

CONSTRUCTION YEAR<\/p><\/div><\/div>

10\/2009 to 04\/2011<\/p>\n<\/div><\/div><\/div>

DESIGNER + CONSULTANT<\/p><\/div><\/div>

    \n
  • Terre Arm\u00e9e (Reinforced Earth India Pvt. Ltd.)<\/li>\n
  • Arvee Associates Pvt. Ltd.<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div><\/div>
    <\/span><\/div><\/div><\/div><\/div><\/div>
    <\/span><\/div>

    Background<\/h2><\/div>

    The project was conceived by Hyderabad Growth Corridor Limited (a joint venture of HUDA and INCAP) to facilitate the growth of Hyderabad city.<\/p>\n

    The project consists of a 6\/8 Lane 159 km ring road that connects Patancheru-Shamshabad-Hayathnagar-Medchal-Patancheru, providing connectivity to various State Highways and National Highways to by-pass the city of Hyderabad.
    \nContinental Engineering Construction Pvt Ltd was awarded 11 km of length as part of the project, from Gachibowli to Shamshabad.<\/p>\n

    Terre Arm\u00e9e in India was chosen as the technology partner by Continental Engineering Construction Pvt Ltd, because of its intellectual excellence and brand trust in the market.<\/p>\n<\/div><\/div><\/div>

    <\/span><\/div>

    Challenge<\/h2><\/div>

    A major challenge was to complete the project within time considering that the project falls under a huge traffic flow area due to airport connectivity.<\/p>\n

    Also, there was a Road Over Bridge (ROB) in this project. In this ROB, the height of the Reinforced Earth\u00ae wall was more than 17m.<\/p>\n

    Many of the proposed Reinforced Earth\u00ae structures had heights of more than 11m. Due to such significant heights, meeting the budget of the project was a big challenge.<\/p>\n

    At some locations, walls needed to be constructed at two different tiers.<\/p>\n

    Maintaining safe working condition for the workforce, especially those working from heights, was a major concern in this project.<\/p>\n<\/div><\/div><\/div>

    <\/span><\/div>

    Solution<\/h2><\/div>

    In a detailed design process, Terre Arm\u00e9e in India used in-house technical know-how to design the Reinforced Earth\u00ae wall using two different systems.<\/p>\n

    Due to varying heights, Terre Arm\u00e9e in India has used Freyssisol\u00ae system with Geostrap 9 as soil reinforcement for wall heights up to 11m and High Adherence (HA™) Galvanized Steel Strips as soil reinforcing elements for wall heights from 11m to 17.5m.<\/p>\n

    The entire project was carried out using 180mm thick TerraTee\u00ae panels. Terre Arm\u00e9e in India successfully designed and constructed the two tier structure in this project.<\/p>\n

    Terre Arm\u00e9e in India carried out pull out tests by inserting dummy soil reinforcement in the Reinforced Earth\u00ae Wall. The results were satisfactory and increased confidence of clients, consultants and contractors in Terre Arm\u00e9e\u2019s technology and commitment.<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"

    Construction of Reinforced Earth\u00ae wall at Trumpet Interchange of Phase I on NH-07 at Bengaluru International Airport in the state of Karnataka, India.<\/p>\n","protected":false},"author":5977,"featured_media":8496,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"portfolio_category":[356,357],"portfolio_skills":[],"portfolio_tags":[],"class_list":["post-8369","avada_portfolio","type-avada_portfolio","status-publish","format-standard","has-post-thumbnail","hentry","portfolio_category-case-study","portfolio_category-retaining-walls-case-study"],"yoast_head":"\nREINFORCED EARTH\u00ae WALL AT SHAMSHABAD INTERCHANGE - Case Study<\/title>\n<meta name=\"description\" content=\"Construction of Reinforced Earth\u00ae Wall on the Outer Ring Road to Hyderabad city (Phase I \u2013 Gachibowli to Shamshabad) in the state of Andhra Pradesh, India.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"REINFORCED EARTH\u00ae WALL AT SHAMSHABAD INTERCHANGE - Case Study\" \/>\n<meta property=\"og:description\" content=\"Construction of Reinforced Earth\u00ae Wall on the Outer Ring Road to Hyderabad city (Phase I \u2013 Gachibowli to Shamshabad) in the state of Andhra Pradesh, India.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/\" \/>\n<meta property=\"og:site_name\" content=\"Terre Arm\u00e9e India\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/TerreArmeeIndia\/\" \/>\n<meta property=\"article:modified_time\" content=\"2022-01-20T06:53:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.terrearmeeindia.com\/wp-content\/uploads\/sites\/7\/2022\/01\/Shamshabad-Interchange-casestudy-3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"441\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@terrearmeeindia\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/\",\"url\":\"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/\",\"name\":\"REINFORCED EARTH\u00ae WALL AT SHAMSHABAD INTERCHANGE - Case Study\",\"isPartOf\":{\"@id\":\"https:\/\/www.terrearmeeindia.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.terrearmeeindia.com\/wp-content\/uploads\/sites\/7\/2022\/01\/Shamshabad-Interchange-casestudy-3.jpg\",\"datePublished\":\"2022-01-13T10:37:59+00:00\",\"dateModified\":\"2022-01-20T06:53:47+00:00\",\"description\":\"Construction of Reinforced Earth\u00ae Wall on the Outer Ring Road to Hyderabad city (Phase I \u2013 Gachibowli to Shamshabad) in the state of Andhra Pradesh, India.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/#primaryimage\",\"url\":\"https:\/\/www.terrearmeeindia.com\/wp-content\/uploads\/sites\/7\/2022\/01\/Shamshabad-Interchange-casestudy-3.jpg\",\"contentUrl\":\"https:\/\/www.terrearmeeindia.com\/wp-content\/uploads\/sites\/7\/2022\/01\/Shamshabad-Interchange-casestudy-3.jpg\",\"width\":700,\"height\":441},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.terrearmeeindia.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Portfolio\",\"item\":\"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Shamshabad Interchange\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.terrearmeeindia.com\/#website\",\"url\":\"https:\/\/www.terrearmeeindia.com\/\",\"name\":\"Terre Arm\u00e9e India\",\"description\":\"Terre Arm\u00e9e\",\"publisher\":{\"@id\":\"https:\/\/www.terrearmeeindia.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.terrearmeeindia.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.terrearmeeindia.com\/#organization\",\"name\":\"Terre Arm\u00e9e\",\"url\":\"https:\/\/www.terrearmeeindia.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.terrearmeeindia.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.terrearmeeindia.com\/wp-content\/uploads\/sites\/7\/2019\/07\/Terre-Armee-214.png\",\"contentUrl\":\"https:\/\/www.terrearmeeindia.com\/wp-content\/uploads\/sites\/7\/2019\/07\/Terre-Armee-214.png\",\"width\":214,\"height\":87,\"caption\":\"Terre Arm\u00e9e\"},\"image\":{\"@id\":\"https:\/\/www.terrearmeeindia.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/TerreArmeeIndia\/\",\"https:\/\/x.com\/terrearmeeindia\",\"https:\/\/www.linkedin.com\/in\/terre-armee-india-195745156\/\",\"https:\/\/www.youtube.com\/user\/terrearmeegroup\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"REINFORCED EARTH\u00ae WALL AT SHAMSHABAD INTERCHANGE - Case Study","description":"Construction of Reinforced Earth\u00ae Wall on the Outer Ring Road to Hyderabad city (Phase I \u2013 Gachibowli to Shamshabad) in the state of Andhra Pradesh, India.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/","og_locale":"en_US","og_type":"article","og_title":"REINFORCED EARTH\u00ae WALL AT SHAMSHABAD INTERCHANGE - Case Study","og_description":"Construction of Reinforced Earth\u00ae Wall on the Outer Ring Road to Hyderabad city (Phase I \u2013 Gachibowli to Shamshabad) in the state of Andhra Pradesh, India.","og_url":"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/","og_site_name":"Terre Arm\u00e9e India","article_publisher":"https:\/\/www.facebook.com\/TerreArmeeIndia\/","article_modified_time":"2022-01-20T06:53:47+00:00","og_image":[{"width":700,"height":441,"url":"https:\/\/www.terrearmeeindia.com\/wp-content\/uploads\/sites\/7\/2022\/01\/Shamshabad-Interchange-casestudy-3.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@terrearmeeindia","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/","url":"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/","name":"REINFORCED EARTH\u00ae WALL AT SHAMSHABAD INTERCHANGE - Case Study","isPartOf":{"@id":"https:\/\/www.terrearmeeindia.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/#primaryimage"},"image":{"@id":"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/#primaryimage"},"thumbnailUrl":"https:\/\/www.terrearmeeindia.com\/wp-content\/uploads\/sites\/7\/2022\/01\/Shamshabad-Interchange-casestudy-3.jpg","datePublished":"2022-01-13T10:37:59+00:00","dateModified":"2022-01-20T06:53:47+00:00","description":"Construction of Reinforced Earth\u00ae Wall on the Outer Ring Road to Hyderabad city (Phase I \u2013 Gachibowli to Shamshabad) in the state of Andhra Pradesh, India.","breadcrumb":{"@id":"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/#primaryimage","url":"https:\/\/www.terrearmeeindia.com\/wp-content\/uploads\/sites\/7\/2022\/01\/Shamshabad-Interchange-casestudy-3.jpg","contentUrl":"https:\/\/www.terrearmeeindia.com\/wp-content\/uploads\/sites\/7\/2022\/01\/Shamshabad-Interchange-casestudy-3.jpg","width":700,"height":441},{"@type":"BreadcrumbList","@id":"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/shamshabad-interchange\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.terrearmeeindia.com\/"},{"@type":"ListItem","position":2,"name":"Portfolio","item":"https:\/\/www.terrearmeeindia.com\/reinforced-earth\/"},{"@type":"ListItem","position":3,"name":"Shamshabad Interchange"}]},{"@type":"WebSite","@id":"https:\/\/www.terrearmeeindia.com\/#website","url":"https:\/\/www.terrearmeeindia.com\/","name":"Terre Arm\u00e9e India","description":"Terre Arm\u00e9e","publisher":{"@id":"https:\/\/www.terrearmeeindia.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.terrearmeeindia.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.terrearmeeindia.com\/#organization","name":"Terre Arm\u00e9e","url":"https:\/\/www.terrearmeeindia.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.terrearmeeindia.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.terrearmeeindia.com\/wp-content\/uploads\/sites\/7\/2019\/07\/Terre-Armee-214.png","contentUrl":"https:\/\/www.terrearmeeindia.com\/wp-content\/uploads\/sites\/7\/2019\/07\/Terre-Armee-214.png","width":214,"height":87,"caption":"Terre Arm\u00e9e"},"image":{"@id":"https:\/\/www.terrearmeeindia.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/TerreArmeeIndia\/","https:\/\/x.com\/terrearmeeindia","https:\/\/www.linkedin.com\/in\/terre-armee-india-195745156\/","https:\/\/www.youtube.com\/user\/terrearmeegroup"]}]}},"_links":{"self":[{"href":"https:\/\/www.terrearmeeindia.com\/wp-json\/wp\/v2\/avada_portfolio\/8369","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.terrearmeeindia.com\/wp-json\/wp\/v2\/avada_portfolio"}],"about":[{"href":"https:\/\/www.terrearmeeindia.com\/wp-json\/wp\/v2\/types\/avada_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.terrearmeeindia.com\/wp-json\/wp\/v2\/users\/5977"}],"replies":[{"embeddable":true,"href":"https:\/\/www.terrearmeeindia.com\/wp-json\/wp\/v2\/comments?post=8369"}],"version-history":[{"count":0,"href":"https:\/\/www.terrearmeeindia.com\/wp-json\/wp\/v2\/avada_portfolio\/8369\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.terrearmeeindia.com\/wp-json\/wp\/v2\/media\/8496"}],"wp:attachment":[{"href":"https:\/\/www.terrearmeeindia.com\/wp-json\/wp\/v2\/media?parent=8369"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/www.terrearmeeindia.com\/wp-json\/wp\/v2\/portfolio_category?post=8369"},{"taxonomy":"portfolio_skills","embeddable":true,"href":"https:\/\/www.terrearmeeindia.com\/wp-json\/wp\/v2\/portfolio_skills?post=8369"},{"taxonomy":"portfolio_tags","embeddable":true,"href":"https:\/\/www.terrearmeeindia.com\/wp-json\/wp\/v2\/portfolio_tags?post=8369"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}